Installation procedure
1. Wire connecting
2. Installation method
A wiring box cover must be used.
The central controller shall be installed into the installation box built in the
wall fastening with 4 screws (as shown).
Note: Please confirm the supply voltage of AC220-240V and correct wiring. In
application environment with intense electromagnetic interference, the central
controller should be shielded, while the connecting wire between the monitor
and the central controller should be shielded twin twisted wire.
Power supply
To connect the process
control monitor/detector
A B
21
1PH , 220-240V~, 50Hz
91. 5m m
Rear view