CHAPTER 6: ACTUAL VALUES
This menu displays metered values for real and reactive energy. The "SRC 1" text is replaced by the name programmed by
the user for the associated source (see
accumulated, record them and then reset them immediately prior to changing CT or VT characteristics.
6.4.3.8 Demand metering
ACTUAL VALUES  METERING  SOURCE SRC 1  DEMAND
 DEMAND
 SRC 1
This menu displays metered values for current and power demand. The "SRC 1" text is replaced by the name programmed
by the user for the associated source (see
The relay measures (absolute values only) the source demand on each phase and average three phase demand for real,
reactive, and apparent power. These parameters can be monitored to reduce supplier demand penalties or for statistical
metering purposes. Demand calculations are based on the measurement type selected in the
B30 BUS DIFFERENTIAL SYSTEM – INSTRUCTION MANUAL
SETTINGS  SYSTEM SETUP  SIGNAL SOURCES
SRC 1 DMD IA:
0.000 A
SRC 1 DMD IA MAX:
0.000 A
SRC 1 DMD IA DATE:
2001/07/31 16:30:07
SRC 1 DMD IB:
0.000 A
SRC 1 DMD IB MAX:
0.000 A
SRC 1 DMD IB DATE:
2001/07/31 16:30:07
SRC 1 DMD IC:
0.000 A
SRC 1 DMD IC MAX:
0.000 A
SRC 1 DMD IC DATE:
2001/07/31 16:30:07
SRC 1 DMD W:
0.000 W
SRC 1 DMD W MAX:
0.000 W
SRC 1 DMD W DATE:
2001/07/31 16:30:07
SRC 1 DMD VAR:
0.000 var
SRC 1 DMD VAR MAX:
0.000 var
SRC 1 DMD VAR DATE:
2001/07/31 16:30:07
SRC 1 DMD VA:
0.000 VA
SRC 1 DMD VA MAX:
0.000 VA
SRC 1 DMD VA DATE:
2001/07/31 16:30:07
SETTINGS  SYSTEM SETUP  SIGNAL SOURCES
METERING
). Because energy values are
).
SETTINGS  PRODUCT SETUP