Mitsubishi Electric PAC-AH63 Installation Manual page 5

Air handling unit controller
Table of Contents

Advertisement

7
[Fig. 7.1.1]
A
B
C
[Fig. 7.2.1]
A
B
M1M2
M1M2
S
1
2
TB3
TB5
C
[Fig. 7.2.3]
B
1
N
L
[Fig. 7.2.5]
8
[Fig. 8.1.1]
B
A Address switch
B SW2
D
E
C
C
C
C
C
C
A
M1M2
S
1
2
TB15 TB5
TB15
C
2
A
DC10~13V
C
A
B
1
2
B
C
A
A
A Switch 16 A
C Indoor unit
E Pull box
[Fig. 7.2.2]
A
B
M1M2
M1M2
S
TB3
TB5
TB5
C
[Fig. 7.2.4]
D
M1
N
L
D
9
[Fig. 9.0.1]
B Overcurrent protection 16 A
D Total operating current be less than 16 A
A
M1M2
S
A Terminal block for AHU controller/
indoor transmission cable
B Terminal block for outdoor trans-
mission cable
C Remote controller
C
M2
A
A Non-polarized
DC24~30V
B Upper level (TB15)
C Remote Controller
C
1 2
D Lower level (TB5)
(A, B)
A Bunch of wires
B Plug
C Tube
D Insulation tape
5