3 Machine presentation
1
Sensors and overheating thermostats
2
Door
3
Motor
4
Heating unit
5
Drum
6
Control panel with Control system
7
I/O modules
After a repair has been made
Whenever a repair has been made, a function check must be performed before the machine can be used again.
4 Function check
May only be carried out by qualified personnel.
A function check must be made when the installation is finished and before the machine can be ready to be used.
Whenever a repair has been made, a function check must be performed before the machine can be used again.
• Check that water is connected to the machine and that the water tap is open.
• Check that the drain hose has been installed correctly.
Service Manual
fig.8038