Page 1
Do not throw this electronic device into the waste when discarding. To minimize pollu- tion and ensure utmost protection of the global environment, please recycle or return to Photocentric for recycling. Cambridge House, Oxney Road 2205 West Parkside Lane, Phoenix, Peterborough PE1 5YW UK.
USER OF CONFORMITY MANUAL NEW PROFESSIONAL LIQUID CRYSTAL 3D-PRINTER HIGH RESOLUTION Model: LC HR 3D PRINTER We hereby declare that the product above is in compliance with the essential Congratulations requirements of the following: SAFETY Low Voltage (LV) Directive 2009/95/EC, 2014/35EU. Electromagnetic Compa- You have just purchased a new type of 3D printer tibility Directive(EMC), 2004/108/EC,2014/30/EU.
Page 3
Hz, and has an operational voltage of 12 V. Use in a well-ventilated room. The power cord or plug is damaged, cut or se recycle or return to Photocentric for recycling. frayed. Keep the printer out of the reach of small chil- Do not allow anything to rest on the power Liquid was spilled into the product.
Page 4
1. INSTALLATION The box TENT contains & ASSEMBLY INSTRUCTIONS 1. Open the box and carefully remove the printer. Do not pull the printer out by the linear drive/z- axis. 2. Place the printer in the work area and attach the WIFI 4 feet supplied in the ancillary box.
Page 5
3. PREPARE 2. SETTING UP A NETWORK CONNECTIONS LIQUID CRYSTAL FOR PRINTING The LCHR supports two different types of network connection: Ethernet and WiFi. To set up ethernet, simply plug the ethernet cable into the back of the printer and a router. Now you have your printer installed and configured.
Page 6
When your printer has been found succesfully, it should open up the following window. Once the print is ready, select the resin profile from the “Settings tab” / “Resin configuration”. Go to the “Control” page. Click “Browse” and upload the printable in .stl file format; your window should look like this.
Page 7
Your platform and vat should now be assembled. 11. In the controls section of PrintFlow 3D, click the blue button with a home Icon. The platform will Tighten the central knob to lock the platform. move down to rest on the screen (level 0 in Z axis) and stop. Remove the hood. With the vat empty and wearing gloves, press down in the middle of the glass platform to ensure the platform is in contact with the vat film across its entire area.
Page 8
12. Go back to the tab “Home”, press “Slice” and then finally, press “Print”. This will cause the software STARTING A PRINTER FROM to slice the object and begin printing afterwards. Please note that during slicing your browser page THE TOUCHSCREEN OR A USB. should remain open.
Page 9
Your platform and vat should now be assembled. Make sure that the resin profile on this page is set correctly. Tighten the central knob to lock the platform. Ensure the two side knobs are completely loose. Pressing ‘Home’ with them locked could damage the screen.
Page 10
Click the settings button which should show the following screen: In this menu click “Home Z Press the “Print” button, which will display the following screen: Axis”. The platform will move down to rest on the screen (level 0 in Z axis.) and stop. Remove the hood.
Page 11
REMOVE A FILE FROM THE TOUCHSCREEN From the home page press “Print”. Click “Yes” to delete the file. Select the printable you want to remove and click the red button with the X on the right.
Page 12
DELETING FILES FROM THE APPLYING TRANSFORMATIONS WEB INTERFACE TO YOUR FILE Printflow3D allows for some different transformations. These transformation include mirroring, Open “Printflow3D_opener.exe” on the computer. From the home page navigate to the translating, rotating or scaling. To apply mirroring on your part from the 3D view set mirroring to “Yes” “Printables”...
CLEANING THE RE-SKINNING MACHINE AND YOUR THE VAT PRINTED OBJECTS VAT Top Flange - A These steps will minimise any resin spillage and You should empty the vat and clean it after keep your machine clean. every print, in case you have any solid pieces on the bottom, as these would prevent the VAT Tensioning platform from homing correctly.
Page 14
Note: Refrain from fully tightening each bolt Place the main vat tray over the film and gently individually. This will cause the Main Vat to tension press down. Screw the remaining 12 x M3 at an angle. Aim to half tighten the bolts and fully 12mm screws in and the film will tighten.
Need help?
Do you have a question about the LC HR and is the answer not in the manual?
Questions and answers