Haier HCR6250AGS Installation Instructions Manual page 19

24" and 36" gas free-standing range
Hide thumbs Also See for HCR6250AGS:
Table of Contents

Advertisement

Available languages

Available languages

CONNECT GAS LINE FROM GAS PRESSURE REGULATOR TO GAS SUPPLY:
1. Apply pipe-joint compound made for use with LP gas to the tapered (NPT)
threads of both adapters
2. Attach one adapter to the gas pressure regulator and the other to the gas
shutoff valve and tighten both.
NOTE: Do Not rotate the gas pressure regulator.
3. Attach the flexible gas line
IMPORTANT: All connections must be wrench tightened (requires two 10"
adjustable wrenches). Do not over-tighten the connections to the gas pressure
regulator. Overtightening may crack the regulator creating a leak.
COMPLETE CONNECTION
1. Open the manual shutoff valve in the gas supply line. The valve is open when the
handle is parallel to the gas pipe.
2. Test all connections by brushing on an approved noncorrosive leak-detection
solution. If bubbles appear, a leak is indicated. Correct any leak found.
supplied with gas line kit.
d
to adapters
c
e
a
d
c
b
d
, one adapter at each end.
d
a
Adapter (provided)
b
Gas Pressure Regulator
c
Gas Supply Line
d
Adapters (From Gas
Supply Line Kit)
e
Gas Shutoff Valve
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hcr2250ags

Table of Contents