HCD-F200/F500
3-4.
PROCESS IN THE SOLDER BRIDGE
Note: The process in the solder bridge is necessary before optical pick-up or DMB-FIT board is removed.
When this process is neglected, optical pick-up is damaged.
eight screws
(BVTP3 × 6)
Note: Please spread a seat under a set
not to injure front panel assy.
CAUTION
Be sure to execute a solder bridge as a measure against
static electricity when removing the optical pick-up or
DMB-FIT board.
(Otherwise, the OP block will be destroyed.)
12
cushion (foot)
sheet
two claws
cover (chassis)
– rear view –
flexible flat cable
Lift up the FFC holder.