Process In The Solder Bridge - Sony SA-WSF200 Service Manual

Table of Contents

Advertisement

HCD-F200/F500
3-4.

PROCESS IN THE SOLDER BRIDGE

Note: The process in the solder bridge is necessary before optical pick-up or DMB-FIT board is removed.
When this process is neglected, optical pick-up is damaged.
 eight screws
(BVTP3 × 6)
Note: Please spread a seat under a set
not to injure front panel assy.
CAUTION
 Be sure to execute a solder bridge as a measure against
static electricity when removing the optical pick-up or
DMB-FIT board.
(Otherwise, the OP block will be destroyed.)
12
 cushion (foot)
sheet
 two claws
 cover (chassis)
– rear view –
flexible flat cable
 Lift up the FFC holder.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sa-wsf500Ss-tsf500Ss-f500Ss-ctf500Ss-tsf200

Table of Contents