Installation Adjustments
Loosen the four hexagon screws A, A', B and B', upper and lower fixation latch. These screws fasten the cooling house of the red
tube.
Pivot the red CRT until the center of the red image coincides with the center of the green image. If the angle of the red CRT is corrected,
tighten the four bolts.
Screws A, B, C and D (M4) : upper
fixation latch. nutdriver 7mm.
Screw A', B', C' and D' (M4) : lower
fixation latch. nutdriver 7mm.
Loosen the four hexagon screws C, C', Dand D', upper and lower fixation latch. These screws fasten the cooling house of the blue
tube.
Pivot the blue CRT until the center of the blue image coincides with the center of the green image. If the angle of the red CRT is corrected,
tighten the four bolts.
6-8
$
$
$
$
red crosshair
green crosshair
Move the red CRT
towards the green
CRT
red crosshair
green crosshair
Move the red CRT
to the outside,
away from the
green CRT
blue crosshair
green crosshair
Move the blue CRT
to the outside,
away from the
green CRT
blue crosshair
green crosshair
Move the blue CRT
towards the green
CRT
%
%
&
&
'
'
%
%
&
&
'
'
CRT
PROJECTION ANGLE
ADJUSTMENT
Align crosshairs
<ENTER> continue
<EXIT> to return
CRT
PROJECTION ANGLE
ADJUSTMENT
Align crosshairs
<ENTER> continue
<EXIT> to return
5976067 BARCOCINE 7 151299