3.2
3.3
Siemens AG
2. Confirm with OK.
 All the data is saved onto the drive until it is overwritten via a further RAM to
ROM command.

Preparing for commissioning

Prior to commissioning, you should have an answer to the following questions:
Which communication protocol does the drive use?
 See section Communication [➙ 30].
In which region is the motor being used?
 See [p0100] "Motor standard IEC/NEMA" BOP-2 in Basic commissioning with
the wizard [➙ 24].
What type of control is needed for the application?
 See [p1300] "Control type" Additional important parameters [➙ 29].
Which speed limits does the motor use?
 See [p1080] and [p1082] "Minimum and maximum speed" Setting the ramp-
function generator [➙ 27].
What motor ramp-up time and ramp-down time are needed for the application?
 See [p1120] and [p1121] "Ramp-up and ramp-down time" Setting the ramp-
function generator [➙ 27].

Basic factory settings

ON / OFF
Reverse
Acknowledge
Control
Setpoint 0 - 10 V
System
Figure 1: Terminal assignment in the factory settings (corresponds to MacPar15 = 12)
Preparing for commissioning
9
P24V
AO0+
5
AO0-
DI0
6
AO1+
DI1
7
AO1-
DI2
DO0
28
GND
69
DI COM
DO1
3
AI0+
4
AI0-
DO2
Commissioning
3
12
Speed
13
(0..20mA)
26
Output current
27
(0..20mA)
20
19
Fault
18
22
Alarm
21
25
24
Operation
23
23
CM2G5111en
2014-05-16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents