Mitsubishi Electric GOT2000 Connection Manual page 63

Graphic operation terminal
Hide thumbs Also See for GOT2000:
Table of Contents

Advertisement

When connecting to multiple controllers
(a) PCON, ACON, SCON, ERC2 (SIO specifications), ERC2 (NP/PN specifications)
Connection cable 1)
Junction
Terminal cable
Connection
Terminal
Controller
cable
cable 1)
Connection
Model
Cable
diagram
name
model
number
PCON
ACON
CB-RCB-
SCON
RS422/485
CTL002
ERC2 (NP/PN
connection
(0.2m)
specifications)
diagram 1)
*5
PCON
ACON
SCON
ERC2
box 4D
Connection cable 2)
Junction box
Connection
*1
*2
cable 2)
4D
Connection
Model name
diagram
number
RS422/485
5-1473574-4
connection
diagram 2)
2. CONNECTION TO IAI ROBOT CONTROLLER
PCON
ACON
SCON
ERC2
Connection cable 1)
Junction
box 4D
Connection cable 3)
Connection cable
3)
Connection
Option device
diagram number
FA-LTBGT2R4CBL05(0.5m)
RS422/485
FA-LTBGT2R4CBL10(1m)
connection diagram 3)
FA-LTBGT2R4CBL20(2m)
-
(Built into GOT)
RS422/485
connection diagram 4)
GT15-RS4-9S
RS422/485
GT15-RS4-TE
connection diagram 5)
2.2 System Configuration
Communication driver
IAI ROBO CYLINDER
GOT
GOT
Max.
Number of
disat
connectable
ance
equipment
Model
*3
*3
*3
16
100m
Controllers
for 1 GOT
2
2 - 9

Advertisement

Table of Contents
loading

Table of Contents