Table Of Contents; Job Specification Sheet - Pentair FLECK 5600SXT Service Manual

Hide thumbs Also See for FLECK 5600SXT:
Table of Contents

Advertisement

TABLE OF CONTENTS

JOB SPECIFICATION SHEET ...............................................2
INSTALLATION .....................................................................3
START-UP INSTRUCTIONS..................................................3
TIMER FEATURES ................................................................4
TIMER OPERATION ..............................................................5
MASTER PROGRAMMING MODE CHART ............................6
MASTER PROGRAMMING MODE .........................................7
USER PROGRAMMING MODE............................................ 10
DIAGNOSTIC PROGRAMMING MODE ................................ 10
CONTROL VALVE ASSEMBLY ............................................ 12
VALVE POWERHEAD ASSEMBLY ...................................... 14
3/4-INCH TURBINE METER ASSEMBLY .......................... 15
BYPASS VALVE ASSEMBLY (PLASTIC) .............................. 16
BYPASS VALVE ASSEMBLY (METAL) ................................ 17
2300 SAFETY BRINE VALVE .............................................. 18
2310 SAFETY BRINE VALVE ............................................. 19
TROUBLESHOOTING .......................................................... 20
WATER CONDITIONER FLOW DIAGRAMS ......................... 22
WIRING DIAGRAM .............................................................. 23
SERVICE INSTRUCTIONS .................................................. 24
FLOW DATA & INJECTOR DRAW RATES .......................... 26
SERVICE ASSEMBLIES ...................................................... 27
CALIFORNIA PROPOSITION 65 WARNING
This product contains chemicals known to
WARNING:
the State of California to cause cancer or
birth defects or other reproductive harm.
2 • FLECK
5600SXT Downflow Service Manual

JOB SPECIFICATION SHEET

Job Number: ______________________________________________
Model Number: ____________________________________________
Water Hardness: __________________________________ ppm or gpg
Capacity Per Unit: __________________________________________
Mineral Tank Size: ___________ Diameter: ________Height: ________
Salt Setting per Regeneration: ________________________________
1. Type of Timer:
A. Time Clock
B. Meter Initiated
2. Downflow:
Upflow
3. Meter Size:
A. 3/4-inch Turbine
B. 3/4-inch Paddle Wheel
C. Electronic ____Pulse Count ___ Meter Size ____________
4. System Type:
A. System #4: 1 Tank, 1 Meter, Immediate, or
Delayed Regeneration
B. System #4: Time Clock
5. Timer Program Settings:
A. Backwash: ______________________________ Minutes
B. Brine and Slow Rinse:_____________________ Minutes
C. Rapid Rinse: ____________________________ Minutes
D. Brine Tank Refill: ________________________ Minutes
E. Pause Time: ____________________________ Minutes
F. Second Backwash: _______________________ Minutes
6. Drain Line Flow Control:
7. Brine Line Flow Controller:
8. Injector Size#:
Upflow Variable
gpm
gpm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents