Test Operation With Operation Panel; Turn On The Power Supply - GE VAT2000 Instruction Manual

Ac speed control equipment
Hide thumbs Also See for VAT2000:
Table of Contents

Advertisement

3-7 Test operation with operation panel

The test operation with the operation panel is performed with the following procedure.
Make sure that input signals to digital Inputs, RUN, EMS, PSI1 ~ 5 terminals are OFF

(1) Turn ON the power supply.

All LEDs will light momentarily on the display, and then
"
", "
displayed.
The "LCL" and "Hz" LED will also light.
Set the parameter C02-0 to 3 (panel fixed); it will enable
the speed setting from the operation panel. Refer to
section 4-5 for details on changing the parameters.
The motor will run. Confirm the safety around the motor before start
(2) Press the
The "FDW" LED will light and the display will change from "
local setting frequency (A00-0) is set to 10Hz as the default setting.
1. Did the motor run?
2. Is the run direction correct? Check the wiring and operation if abnormal.
3. Is the rotation smooth?
(3) Press the
(4) Press the
(5) Press the
(6) Press the
(7) Press the
The display will stop at "
may be changed.
The digit to change can be selected with the
increased / decreased with the
3. Test Operation and Adjustment
" and "
".will be sequentially
key.
key and confirm that the motor runs in reverse.
key and stop the motor.
key. The motor will forward run at 10Hz.
key once. The display will alternate between "
key once.
", and the last digit will blink. Now the value set in parameter A00-0
knob.
CAUTION
CAUTION
CHECK
key. The output frequency (digit value) can be
3-15
LCL
FWD
REV
FLT
" to "
". This is because the
" and "
Hz
A
%
- 1
min
".

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents