3-3 Flow of Test Operation

Installation and wiring
Initial power supply
Setting of rated items
Automatic Tuning
Test operation with
operation panel
Setting of parameters
compatible with
external control
Test operation including
End of test operation
Fig. 3.1 Test operation procedure
1. Check that the wiring is correct.
2. The power supply must always be kept in the tolerable range.
3. Always check that the inverter rating and motor rating match.
4. Always correctly install the front cover before turning the power on.
5. Assign one worker to operate the switches, etc.
6. Refer to the Chapter 6 and observe the precautions when changing the set values such as torque
boost A02-0.
3. Test Operation and Adjustment
Start
external control
Refer to part 3-4 to 3-6
Refer to part 3-6
Refer to Chapter 5, and perform test operation with
the control input/output from the terminal block.
CAUTION
3-3