Line Load Control - NEC NEAX 2400 ICS Features Manual

Hide thumbs Also See for NEAX 2400 ICS:
Table of Contents

Advertisement

L-11
General Description
This feature allows the Attendant to deny a preselected group of stations the ability to originate calls by
activating a key. The sole intention of this feature is to temporarily restrict the least important internal
stations from outward calling during an excessive traffic load or emergency conditions.
Operating Procedure
To activate LINE LOAD CONTROL from the ATTENDANT CONSOLE [A-3]:
a.) Press a loop key.
b.) Dial the LINE LOAD CONTROL access code; receive Service Set Tone.
c.) Press the "RLS" key.
To cancel LINE LOAD CONTROL from the ATTENDANT CONSOLE [A-3]:
a.) Press the loop key.
b.) Dial the LINE LOAD CONTROL cancel code; receive Service Set Tone.
c.) Press the "RLS" key.
Service Conditions
1.
This feature is controlled entirely from the ATTENDANT CONSOLE [A-3].
2.
Individual stations are programmed for this feature via CLASS OF SERVICE - INDIVIDUAL [C-
15].
3.
The lamp on the ATTENDANT CONSOLE [A-3] will illuminate when LINE LOAD CONTROL is
set in the system.
4.
Incoming call from a trunk can be restricted in System Data.
5.
When LINE LOAD CONTROL is activated or cancelled, a system message will be output via the
MAINTENANCE ADMINISTRATION TERMINAL [M-18].
6.
While LINE LOAD CONTROL is activated, a single line station will receive Busy Tone (or the
display for the D
7.
A station in LINE LOAD CONTROL [L-11, 20, 21] can receive incoming calls.
Interactions
1.
Calls in progress are not affected when this feature is activated.
2.
This feature is implemented on a per-system basis.
3.
Only the Attendant Console can activate this feature by seizing a loop and dialing the feature
access code. A designated key cannot be assigned at the Attendant Console to control this
feature.
4.
Access to the System Data via the Maintenance Administration Terminal (MAT) is allowed while
LINE LOAD CONTROL is active.
5.
Station-to-station calling to affected stations is not allowed during LINE LOAD CONTROL.
6.
HOTLINE [H-1] and HOUSE PHONE [H-2] connections become inoperative during LINE LOAD
CONTROL.
NEAX2400 ICS Business Features and Specifications
NDA-24143, Issue 4

Line Load Control

Line Load Control
term
is blank) when going off-hook.
L-11
Page 299

Advertisement

Table of Contents
loading

Table of Contents