Download Print this page

Mitsubishi Electric PUHY-P-YJM-A Installation Manual page 7

Air-conditioners for building application outdoor unit
Hide thumbs Also See for PUHY-P-YJM-A:

Advertisement

10
[Fig. 10.2.1]
P200~P400
EP200,EP250
<B>
<A>
D
G
[Fig. 10.2.2]
<A> Front pipe routing
fed
<C>
754
<C>
No.
1
IDø19.05
C Shape
ODø19.05
<Gas side>
No.
2
IDø25.4
C Shape
ODø25.4
<Gas side>
1
2
P200
1
P250
1
P300
1
P350
1
P400
1
P450
EP200
1
EP250
1
EP300
<A> Front pipe routing
<C> Included with outdoor unit
A Gas pipe (field supply required)
C Shape
*4: EP650YSJM-A : Use the included connecting pipe 6 , 8, and c to connect to the twinning kit.
*5: EP700YSJM-A1 : Use the included connecting pipe 6 to connect to the twinning kit.
*6: EP750YSJM-A1 : Use the included connecting pipe 6 to connect to the twinning kit.
(*4 ~ *6 : Refer to item 9.2.)
P450
EP300
<B>
<A>
O
S
D
A
A
E
E
G
F
123
90ab
<C>
A
B
3
5
IDø28.58
ODø9.52
ODø28.58
IDø15.88
<Liquid side>
<Gas side>
4
6
ODø9.52
ODø12.7
IDø9.52
IDø12.7
<Liquid side>
<Liquid side>
3
4
5
6
1
1
1
1
1
1
<B> Bottom pipe routing
B Liquid pipe (field supply required)
10.2
B
<A> Refrigerant service valve
C
(liquid side/brazed type)
<B> Refrigerant service valve
D
(gas side/brazed type)
A : Shaft
B : Shaft
C : Stopper pin
D : Service port
E : Cap
F : Pinched connecting pipe severing portion
F
G : Pinched connecting pipe brazing portion
<B> Bottom pipe routing
<C>
7
9
ODø12.7
ODø19.05
IDø15.88
IDø25.4
<Liquid side>
<Gas side>
8
0
ODø19.05
ODø22.2
IDø15.88
IDø25.4
<Liquid side>
<Gas side>
7
8
9
0
1
1
1
1
1
1
1
1
1
[Fig. 10.2.3]
A
A : Example of closure materials (field supply)
B : Fill the gap at the site
90ab
<C>
457
<C>
A
B
a
c
ODø22.2
ODø34.93
IDø28.58
IDø28.58
<Liquid side>
<Gas side>
<Gas side>
b
d
ODø28.58
IDø9.52
IDø15.88
IDø25.4
ODø9.52
<Gas side>
<Liquid side>
<Liquid side>
a
b
c
d
e
1
1
1
1
1
1
1
B
e
IDø12.7
ODø12.7
f
ODø15.88
f
1
1
1
1
1
1
7

Advertisement

loading

This manual is also suitable for:

Puhy-p-yjm-bsPuhy-ep-yjm-a