INSTALLATION PROCEDURE
Install the air conditioner as follows:
1. PREPARING INDOOR UNIT INSTALLATION
REMOVE THE INTAKE GRILLE AND SIDE COVER.
(1) Remove the two Air filters (Fig.4).
(2) Remove the two Intake grilles (Fig.4).
r
t
• For
Left rear drain and
Left drain: Remove air
filters and intake grilles at three places. (Refer to "2.
INDOOR UNIT INSTALLATION".)
(3) Remove the Side cover A (Right side) and Side
cover B (Right and Left side).
t
• For
Left drain : Remove both the Side cover A
(Right and Left side). (Refer to "2. INDOOR UNIT
INSTALLATION".)
(4) This air conditioner can be set up to intake fresh air.
For information about how to install for fresh-air
intake, refer to "13. FRESH-AIR INTAKE".
Air filter
Fig. 4
Intake grille
Tapping
screw
INDOOR UNIT
Side cover B
(Left side)
Side cover A (Right side)
Side cover B (Right side)
2. INDOOR UNIT INSTALLATION
You can use the accessory template to help you install
the indoor unit. The template helps you determine the
appropriate locations for suspension bolts and pipe
openings (drain pipe and connection cord).
Fig. 5
Drilling position for Suspension bolt
Ceiling
Wall
Template
Drilling position for piping
1. LOCATION OF CEILING SUSPENSION
BOLTS
Fig. 6
Suspension bolt pitch
30 mm
30 mm
1,600 mm
Dimensions
(Space Required
for Installation)
10 mm
155 mm
INDOOR UNIT (TOP VIEW)
300 mm
Suspension bolt
should extend out-
INDOOR UNIT
ward 30 to 75 mm.