Crankcase (Right) - Yamaha DT125RE 2005 Service Manual

Table of Contents

Advertisement

ENGINE ASSEMBLY AND ADJUSTMENTS
3
2
1
1
3
NOTE:
• The embossed marks mqRA.anq on the
shift forks should face towards the left side
of the engine and be in the following
sequence: "3", "2", "1".
• The grooved side of the shift fork guide bar
should face towards the right side of the
engine.

CRANKCASE (RIGHT)

1. Install:
• Bearing retainer
Screw (Bearing retainer):
7 Nm (0.7 m•kg; 5.1 ft•lb)
Use Loctite®
2. Apply:
• yamaha Bond nº4
(to mating surface of both crankcase hal-
ves)
Yamaha Bond nº4:
90890-05143
3. Install:
• Damper collar
• Dowel pins
4. Install:
• Crankcase (Right)
Installation steps:
• Apply the lithium soap base grease to the
oil seal lips.
• Fit the right crankcase onto the left case.
Tap lightly on the case with a soft hammer.
NOTE:
Turn the shift cam to the position shown in the
figure so that it doesn't contact the crankcase
when installing the crankcase.
• Install the water outlet pipe stay
• Tighten the bolts (Crankcase)
5-39
ENG

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dt125x 2005Dtr 125

Table of Contents