ParaBody cm3 User Manual page 24

Parabody gym system user's guide
Hide thumbs Also See for cm3:
Table of Contents

Advertisement

FIGURE 28
32
41
20
31
41
19
26
22
30
59
41
STEP 28:
• Assemble two 14-1/2" SEWN HANDLES (19) to the ARM CABLE (31) using two SNAP LINKS (41) as shown in FIGURE 28.
• Assemble two 7-1/2" SEWN HANDLES (20) to the BOOM CABLE (32) using two SNAP LINKS (41) as shown in FIGURE 28.
• Assemble the ANKLE STRAP (26) or the LOW ROW BAR (22) to the LEG CABLE (30) using two SNAP LINKS (41) and one
12-LINK CHAIN (59) as shown in FIGURE 28.
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents