Unfastening of the stationary seal ring and of the screw-connection body (steps 5 – 6)
Mounting of the stationary seal ring and of the screw connection body (steps 7 – 8)
DANGER!
Overpressure!
Observe the type plate indications regarding the maximum pressure!
It is imperative that the compressed-air line is pressureless prior to installation!
DANGER!
Compressed air!
The process steps described in the following must be carried out by correspondingly qualified personnel.
Never carry out works on a plant which is under pressure.
The user must ensure that the METPOINT
indicated on the type plate. Exceeding the maximum operating pressure can cause both injuries and severe
damage to the measuring device.
The sampling probe has a G 3/8'' internal thread connection. Other connections are possible for custom-
made special probes.
The sampling probe must be installed vertically in the rising main.
Touch the sampling probe only at the upper part, in front of the housing. Hands/fingers exude grease which
may lead to incorrect measuring results.
The reference gas generation unit requires a pre-heating time of approx. two hours. Only after this pre-
heating time has expired may compressed air flow through the device.
METPOINT
®
OCV
5. Remove the wrapped stationary seal ring (6)
from the METPOINT
be undone by carefully using a side cutter.
6. Please unfasten the screw-connection body
(5) from the sampling probe by turning.
®
OCV is never operated at a pressure exceeding the value
Installation
®
OCV. The cable tie can