Mechanical Installation - Siemens simatic hmi op7 Equipment Manual

Operator panel
Table of Contents

Advertisement

14.1

Mechanical Installation

Installing the OP
Front panel
14-2
Step
1
Push the enclosed gasket from the rear over the housing and
insert the OP from the front in the prepared mounting cutout.
Take suitable measures to prevent the OP from falling out of the
front panel before it is finally fixed in position.
2
Insert the retaining hooks of the screw type clamps
enclosed with the OP into the corresponding mounting locations
in the housing of the OP.
You require four screw type clamps for the OP7 and five for the
OP17.
3
Tighten the OP from behind in the front panel using a screw-
driver
.
Note:
Make sure that the gasket fits properly on the front
plate. Avoid excessively high torques.
OP7
Procedure
OP17
Equipment Manual OP7, OP17
Release 04/99

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents