Mount The Switch; Rack Or Cabinet Mounting - HP E2620 Installation And Getting Started Manual

Table of Contents

Advertisement

W A R N I N G
E q u i p m e n t
C a b i n e t
N o t e

3. Mount the Switch

After the switch passes self test, it is ready to be mounted in a stable location.
The E2620 Switches can be mounted in these ways:
Mounting Location
In a rack or cabinet
On a horizontal surface
On a wall
Under a desk
1
This also includes the E2620-24-PPoE+ Switch (J9624A).
2
RJ-45 ports facing up only.

Rack or Cabinet Mounting

The E2620 Switches are designed to be mounted in any EIA-standard 19-inch
telco rack or communication equipment cabinet. Note that the mounting
brackets have multiple mounting holes and can be rotated allowing for a wide
variety of mounting options. Secure the rack in accordance with the
manufacture's safety guidelines.
For safe operation, please read the mounting precautions on
page
2-3, before mounting a switch.
The 12-24 screws supplied with the switch are the correct threading for
standard EIA/TIA open 19-inch racks. If installing the switch in an equipment
cabinet such as a server cabinet, use the clips and screws that came with the
cabinet in place of the 12-24 screws that are supplied with the switch.
Non-PoE+ Switches
PoE+ Switches
Yes
Yes
1,2
Yes
1
Yes
Installing the Switch
Installation Procedures
Yes
Yes
No
No
2-9

Advertisement

Table of Contents
loading

Table of Contents