Integrated Panel Installation - U-Line CO29F User Manual

Volume of 2.1 cu ft
Hide thumbs Also See for CO29F:
Table of Contents

Advertisement

USER GUIDE
SAFETY • INSTALLATION & INTEGRATION • OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE

Integrated Panel Installation

This model accepts a 1/4" insert panel.
INSERT PANEL INSTALLATION
Install the insert as follows:
!
CAUTION
Use care when handling the insert. Insert edges
may be sharp.
1. Remove top hinge screw pin
with Phillips head screwdriver.
Remove door by tilting forward
and lifting off bottom hinge pin.
2. Pull door gasket out of groove
(top edge of door only). Start in
the middle and pull outward,
moving toward the edge. This
may take some force.
3. Remove two outside screws
holding door handle. Slightly
separate door handle from door.
4. Pull handle up and off.
5. Slide custom door panel insert into 1/4" (6 mm)
channel in door front.
NOTICE
Use care not to damage magnet, located on door
bottom when installing door insert. Do not set
door on bottom edge when pushing insert into
place.
6. Holding door gasket out of the way, replace handle on
door, making sure it is seated properly on insert and
that screw holes line up.
7. Install two small screws removed in Step 3.
8. Starting at the corners and working inward, push door
gasket into place on door.
9. Place door on bottom hinge pin and install upper hinge
screw.
u-line.com
Integrated Panel Installation 1

Advertisement

Table of Contents
loading

Table of Contents