12"
MIN
305 mm
4"
24"
MIN
MIN.
102 mm
610 mm
305 mm
Place the machine adjacent to the foundation. Do not attempt to move it by pushing on the
sides.
1. Remove the wood skid by unscrewing the carriage bolts holding it to the bottom
frame of the machine.
2. Carefully place the machine over the anchor bolts. Raise and level it 1/2 inch
above the floor on four points, using spacers that can be removed.
3. Fill the spaces between the machine base and floor with machinery grout. Grout
completely under the frame members. Remove front panel and rear panel to
gain access to all frame members. Force grout under the machine base until all
voids are filled.
4. Remove the spacers carefully, allowing the machine to settle into the wet grout.
5. Attached the mounting bolt washers and lock nuts to the anchor bolts after the
grout has hardened. Tighten the lock nuts by even increments-one after the
other-until all are tightened evenly and the machine is fastened securely to the
floor. The nuts should be tightened in a diagonal fashion, which will help ensure
equal tension at all anchor points. Retighten after one week of operation.
Installation
Machine Foundation
12"
30"
762 mm
Recommended
for service
12"
305 mm
17
Emergency electrical
cutoff
(2) 3/4"GHT water lines
Electrical power inlet
(2) 1" water supply lines,
provide 3/4" ball valve cutoffs
with 3/4"GHT male connections
12" (305 mm) Allowable
6" (152 mm) Recommended
Excavate under existing floor
Pour new concrete (3500 PSI)
in pyrimid shape as shown.
Bond to existing floor.
Do not isolate!