Mitsubishi MELSEC System Q Manual page 30

Hide thumbs Also See for MELSEC System Q:
Table of Contents

Advertisement

The CPU Modules
Procedure to switch a PLC CPU from "STOP" to "RUN" after the program or parameters have
been changed during "STOP":
Switch the RESET/L.CLR switch to the "RESET" position.
Switch the RUN/STOP switch from "STOP" to "RUN".
However, when you want to set the CPU to "RUN" without clearing the device information:
Switch the RUN/STOP switch from "STOP" to "RUN
Switch the RUN/STOP switch back to "STOP"
Switch the RUN/STOP switch to "RUN".
ERR. and USER LED
BAT and BOOT LED
3 – 10
ON:
After the detection of an error during self-diag-
nostics.This error will not stop operation.
OFF:
Normal operation of the CPU
Flicker:
An error that stops the operation has been
detected during self-diagnostic.
ON:
An error has been detected by the CHK instruc-
tion or an annunciator (F) has been switched ON.
OFF:
Normal operation of the CPU
Flicker:
Execution of latch clear
ON:
Voltage of either the battery for the CPU or the
memory card is too low.
OFF:
Voltage is normal
ON:
Start of boot operation
OFF:
Boot operation is not being performed
The MELSEC System Q
MITSUBISHI ELECTRIC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents