Verifying installation requirements
The installation takes less than 10 minutes. You will
need the following items:
Replacement director blade
Filler panel for each empty slot (ships with the
director blade)
Electrostatic discharge (ESD) grounding strap
Workstation computer
Phillips screwdriver
Small form-factor pluggable (SFP) transceivers, as
needed (must be ordered separately)
Quad SFP (QSFP) transceivers, as needed (must
be ordered separately)
Extended form-factor pluggable (XFP) transceivers,
as needed, for the FC10-6 only
Optical cables, as needed
Transceiver support
The FC8-64 supports mSFPs only, and is shipped
with them installed.
Except for the FC8-64, all 8 Gb and 16 Gb
blades use B-series SFPs.
CR16-8 and CR16-4 use QSFP transceivers for
ICL connections.
For more information about supported transceivers,
see the HP SPOCK website at
http://www.hp.com/
storage/spock. You must sign up for an HP Passport
to gain access.
For information on SAN compatibility, see
http://
www.hpsancompat.com/.
Removing the filler panel
Remove the filler panel, if installed. There are three
filler panel types
(Figure 18 (page
11)).
CAUTION:
Remove a filler panel only when
installing or replacing a Director blade. All slots
that are not occupied by a Director blade
require a filler panel to ensure cooling of the
chassis and protection from dust.
To remove a filler panel with a handle:
1.
Unscrew the two captive screws on the filler
panel.
2.
Grasp the handle and remove the filler panel.
To remove a filler panel with ejectors:
Page 1 1