Tue Jun 20 18:14:35 1998: zmlog: message logging resumed
------------------------------------------------------------------
18:14:34 zmast 00101
18:14:34 zmast 00117
18:14:34 zmast 00101
18:14:35 zmon
00002
18:14:35 zmon
00003
18:14:43 zmon
00020
18:14:43 zmon
00004
18:14:43 zmast 00101
18:14:54 zcom
00165
# zmasterd stop
Chapter 2
Launched daemon zmlog, pid 2709.
Zmasterd daemon start running...
Launched daemon zmon, pid 2711.
Resource manager (Rev 1.32) for ZCOM 6.2.0.0
Cold start with: /opt/acc/cfg/loopback.tmem
Cold start completed, ZCOM system ready
Waiting for ZMON requests ...
Launched daemon znode, pid 2729.
Node 123 is now UP
Zmasterd starts the daemons that are listed with "start" statements in
the /opt/acc/cfg/zmasterd_list file. For the base ACC product, it starts
the zmlog logging facility, zmon, and znode.
If an error is reported during the start up procedure, it may be necessary
to stop the ZCOM subsystem by running:
The error should then be addressed, and then the ZCOM subsystem
should be restarted. Refer to the ACC Error Guide for a description of
messages reported by zmlog.
Note that file /opt/acc/cfg/zmasterd_list refers to
/opt/acc/cfg/loopback.tmem by default. If another .tmem file will be
used, it is suggested that the /opt/acc/cgf/zmasterd_list file be updated
accordingly. Refer to the ACC Utilities Reference Guide for more
information on the use of zmasterd.

Performing Verification Test

The "ZNODE - Remote Node Daemon" chapter of the ACC Utilities
Reference Guide contains an example of how to demonstrate that the
znode and remote node processing is functioning correctly.