1.1.3
Preparing the Rails for Two-Post Installations
For two-post installations, you can dismantle and reassemble the rail assemblies
(
FIGURE 1-3
has a post depth in the range of 3 to 6 inches (7.5 to 15.0 cm).
1. Remove the nuts that secure the adjustable bracket and discard the adjustable
bracket (
2. Remove the four nuts securing the front bracket.
3. Rotate the front bracket 180 degrees and secure it facing inward (
4. Remove the four nuts that secure the rear bracket.
5. Rotate the rear bracket 180 degrees so that it faces inward (
6. Align the rear bracket to the appropriate markings on the slide assembly and
secure the rear bracket.
7. Repeat Step 1 through Step 6 for the second rail assembly.
Slide assembly
FIGURE 1-3
1-6
Sun Fire E2900 Systems Installation Guide • May 2006
). The rail assemblies can be adjusted to suit a 19-inch two-post rack that
).
FIGURE 1-1
Front bracket
(facing inwards)
Rail Assembly (Modified for Two-Post Installation)
Rear bracket
(facing inwards)
).
FIGURE 1-3
).
FIGURE 1-3
2-Post 3" Position
2-Post 4" Position
2-Post 6" Position
Need help?
Do you have a question about the Fire E2900 and is the answer not in the manual?