Commissioning
8.4

Commissioning the radio gateway on the detector line

36
Building Technologies
Fire Safety & Security Systems
After all radio detectors of a radio cell have been registered at the radio gateway in
battery operation, the FDnet detector line can be commissioned.
LINE
_
+
+
Connection diagram FDnet detector line
Fig. 11
AI = external alarm indicator
Procedure:
1. Connect the FDnet detector line cables to the spring clips 'LINE'.
2. Put the FDnet detector line in operation.
Instructions on the commissioning of the detector line can be found in the control
panel documentation in account. For FS20, this is the document no. 009052.
Allocation of the detectors' serial numbers to FS20:
the last 3 digits concur.
Example: serial number of the detector 80840349
ID on the FS20 control panel ..........349
Topologically, the radio detectors registered on the radio gateway are in a stub.
The stub branches off the FDnet detector line between the FDCW221 and the integrated line
separator FDCL221 of the radio gateway.
The registration sequence of the radio detectors determines the sequence on the stub.