Initial BPX 8600 Node Configuration
This chapter guides you through the initial node configuration that must be done before you can set up
network management, which will enable you to use Cisco WAN Manager workstation to configure
network connections.
Contents of this chapter include:
Summary of Configuration Procedures
•
•
Initial Node Configuration Summary
Command Sequences for Setting Up Nodes
•
Summary of Commands
•
Before proceeding with this chapter, make sure you have completed all procedures in Part Two,
Installation. It is assumed that the BPX chassis is mounted, BPX cards are installed, cables connected,
temporary terminal or network management station is connected, peripherals connected, and the BPX
node is powered up.
You are now ready to do the following:
•
Initially configure the node
–
–
–
–
–
Configure trunks (adding the new node to the network)
•
Configure lines and ports (enabling and configuring user ports)
•
Add and Configure Connections
•
Release 9.3.30, Part Number 78-12907-01 Rev. E0, May 2005
Configure node name
Configure node number
Configure LAN IP address and subnet mask
Configure time zone
Configure network IP relay addresses
C H A P T E R
Cisco BPX 8600 Series Installation and Configuration
17
17-1