r0087

CO: Actual power factor / Cos phi act

VECTOR_G
Can be changed: -
Data type: FloatingPoint32
P-Group: Displays, signals
Not for motor type: -
Min
-
Description:
Displays the actual active power factor.
r0088

CO: DC link voltage setpoint / Vdc setpoint

VECTOR_G
Can be changed: -
(Tech_ctrl)
Data type: FloatingPoint32
P-Group: Displays, signals
Not for motor type: -
Min
- [V]
Description:
Displays the setpoint for the DC link voltage.
r0089[0...2]

Actual phase voltage / U_phase act val

VECTOR_G
Can be changed: -
Data type: FloatingPoint32
P-Group: Displays, signals
Not for motor type: -
Min
- [V]
Description:
Displays the actual phase voltage.
Index:
[0] = Phase U
[1] = Phase V
[2] = Phase W
Note:
The values are determined from the transistor power-on duration.
p0092

Clock synchronous operation pre-assignment/check / Cl sync op pre-as

CU_G130_DP,
Can be changed: C1(1)
CU_G130_PN,
Data type: Integer16
CU_G150_DP,
P-Group: -
CU_G150_PN
Not for motor type: -
Min
0
Description:
Setting to pre-assign/check the sampling times for the internal controller clock cycles for clock-synchronous
PROFIdrive operation.
Re p0092 = 1:
The controller clock cycles are set so that clock synchronous PROFIdrive operation is possible. If it is not possible to
change the controller clock cycles of the clock-cycle synchronous PROFIdrive operation, then an appropriate
message is output.
The pre-setting of the controller clock cycles can result in a derating of the Motor Module (e.g. p0115[0] = 400 µs -->
375 µs).
When calculating the drive unit utilization (r9976), when using the fixed DCC runtime groups "Receive AFTER IF1
PROFIdrive PZD", "Send BEFORE IF1 PROFIdrive PZD", "Receive AFTER IF2 PZD" (from V4.4) and "Send
BEFORE IF2 PZD" (from V4.4), then its maximum computing time load has already been calculated during ramp-up
for isochronous operation and taken into account in r9976 (from V4.3).
68
Calculated: -
Dyn. index: -
Units group: -
Scaling: -
Max
-
Calculated: -
Dyn. index: -
Units group: 5_2
Scaling: p2001
Max
- [V]
Calculated: -
Dyn. index: -
Units group: 5_3
Scaling: p2001
Max
- [V]
Calculated: -
Dyn. index: -
Units group: -
Scaling: -
Max
1
List Manual (LH2), 04/2014, A5E03263479A
Access level: 3
Func. diagram: 6714, 6730,
6732, 6799
Unit selection: -
Expert list: 1
Factory setting
-
Access level: 3
Func. diagram: -
Unit selection: p0505
Expert list: 1
Factory setting
- [V]
Access level: 3
Func. diagram: 6719
Unit selection: p0505
Expert list: 1
Factory setting
- [V]
Access level: 1
Func. diagram: -
Unit selection: -
Expert list: 1
Factory setting
0
SINAMICS G130/G150

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g130

Table of Contents