Commissioning
Switching on the
machine
Setting the
language
20
Commissioning
During commissioning, the following settings must be carried out.
You will be asked to program settings one after the other automati-
cally, and currently selected values have a tick  beside them. The
commissioning process requires a set period of time which cannot
be interrupted.
The dishwasher will guide you automatically through the steps re-
quired.
Reactivation is carried out during the first program following com-
missioning.
If the first program after commissioning is not completed and the
dishwasher is then turned off, the commissioning process must be
carried out again.
The following options (with the exception of "Plumbing connec-
tions") can be altered retrospectively via the "Settings " menu and
"Additional Settings."
The dishwasher must be connected to the electrical supply.
Close the door
(door must be completely closed for commissioning).
Press the  button until the button's LED lights up.
The commissioning process automatically begins at the language set-
ting screen, where you will be prompted to set the display language.
Language 
deutsch
(
english (GB)
Use the  and  arrow buttons to select the desired language and
confirm your choice with the OK button.
;
,