Installation Instructions - GE JP989 Owner's Manual & Installation Instructions

Table of Contents

Advertisement

4
PREPARING THE COUNTERTOP
The countertop must have a deep flat surface to
accommodate the cooktop and the vent. Countertops
with a rolled front edge and backsplash may not
provide the flat surface area required.
Clearance between inside front of cabinet and rear
of countertop cutout must be 20
accommodate cooktop depth.
" Min.
2
3
8
A 1/2" wide flat area is required around the edge of
opening for support of the unit. The cooktop unit
must be level and sit squarely into countertop opening.
Carefully cut countertop opening according to the
dimensions shown in the illustration. Be sure that
opening is cut squarely, with sides parallel to each
other and rear exactly perpendicular to sides.
20
25"

Installation Instructions

CABINET PREPARATION CUTOUTS
" in order to
5
8
"
20
5
8
1
7
"
5
8
"
28
7
8
" Min.
1
7
8
PREPARING FOR DUCTWORK
5
NOTE: Ductwork MUST be vented to outside.
DO NOT vent into a wall, ceiling, crawlspace, attic
or any concealed space.
Cut hole in cabinet wall or floor as appropriate for
your installation. Make sure exhaust duct is located
between wall studs or floor joists.
NOTE: When cutting or drilling into wall or ceiling, do
not damage electrical wiring and other hidden utilities.
"
9
1
8
" Min.
8
Rear Wall Venting
6
BLOWER TO DUCTWORK
ALIGNMENT
In general, the use of flexible ducting is discouraged
because it can cause severely restricted airflow.
However, if the blower outlet and the floor or wall
duct location do NOT align well, then flexible
METAL ducting can be used to adapt to an offset.
Good alignment without use of flexible ducting is best.
NOTE:
• Do not exceed the maximum recommended
offset of 6".
• Do not allow the flexible ducting to kink or collapse.
• Do stretch the flexible ducting as much as possible to
eliminate as much of the corrugation as possible.
Bottom Venting
NOTE: Illustrations are for planning purposes only.
17
"
8
3
4
"
10
1
8
Downward Venting
6" Max.
Centerline
to Centerline
Offset
Back Venting
(Requires Kit JXRW89)
"
6
1
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents