Safety notices relating to the use of the device
The following safety notices must be adhered to when installing, commissioning, connecting,
replacing components and opening the device.
General information
Safety extra-low voltage
The equipment is designed for operation with Safety Extra-Low Voltage (SELV) by a
Limited Power Source (LPS).
This means that only SELV / LPS complying with IEC 60950-1 / EN 60950-1 / VDE 0805-1
must be connected to the power supply terminals. The power supply unit for the equipment
power supply must comply with NEC Class 2, as described by the National Electrical Code
(r) (ANSI / NFPA 70).
There is an additional requirement if devices are operated with a redundant power supply:
If the equipment is connected to a redundant power supply (two separate power supplies),
both must meet these requirements.
General notices for use in hazardous areas
Risk of explosion when connecting or disconnecting the device
EXPLOSION HAZARD
DO NOT CONNECT OR DISCONNECT EQUIPMENT WHEN A FLAMMABLE OR
COMBUSTIBLE ATMOSPHERE IS PRESENT.
CP 243-1
Operating Instructions, 03/2012, C79000-G8976-C244-02
WARNING
WARNING
2
43

Advertisement

Table of Contents

   Also See for Siemens CP 243-1

   Related Manuals for Siemens CP 243-1

Comments to this Manuals

Symbols: 0
Latest comments: