Samsung VR9180 Service Manual page 49

Hide thumbs Also See for VR9180:
Table of Contents

Advertisement

Disassembly and Reassembly
1-2-9 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass'y Assembly
1) When reinstalling, be sure to align dot of Lever
Load T Ass'y Œ with dot of Lever Load S Ass'y ´
as shown in drawing, (Refer to Timing Point 1).
2) Insert the Pin A,B,C,D into the Slider Cam ˇ hole,
3) Be sure to align dot of Lever Load T Πand dot of
Gear Loading Drive ¨, (Refer to Timing Point 2).
4) Aline dot of Gear Loading drive ¨ with mark of
Slider Cam ˇ as shown in drawing(Refer to
Timing Point 3).
TIMING POINT 1
ΠLEVER LOAD T
TIMING POINT 2
TIMING POINT 3
PIN A
Fig. 1-14 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass'y Assembly
1-8
´ LEVER LOAD S
LEVER LOAD T
LEVER LOAD S
PIN C
PIN D
PIN B
ˇ SLIDER CAM
1-2-10 Lever Pinch Drive,
Lever Tension Drive Removal
1) Remove the Lever Pinch Drive Œ, Lever Tension
Drive ´.
ΠLEVER PINCH DRIVE
Fig. 1-15 Lever Pinch Drive,
Lever Tension Drive Removal
´ LEVER TENSION DRIVE
Samsung Electronics

Advertisement

Table of Contents
loading

Table of Contents