Omega Engineering 100/200 Series User Manual page 30

Data acquisition for notebook, desktop, and tower pcs
Table of Contents

Advertisement

4 – Remove termination panels
Remove the two screws mounting each termination panel to the card drawer.
DaqBook/200 sits
on a shelf above
the card drawer
Top Cover
(
cut-away view
)
DaqBook/260 Hardware Setup
DaqBook/260 Hardware Setup
5 – Determine power requirements
Depending on the power needs of your system's DBK cards, you may need to add a power card.
Reference Note:
Both the DBK Basics section of this manual and the Power Management section of the DBK Option Cards and
Modules User's Manual (p/n OMB-457-0905) contain power-related information. As a part of product support,
the DBK manual is automatically loaded onto your hard drive during software installation. The default location
is the Programs directory, which can be accessed through the Windows Desktop.
3-14
DaqBook Hardware
Top Cover Screws
Steps 2 and 15
DBK Card to
Interconnect Board
Steps 7A and 10A
Card Drawer
01-23-02
P1 Interconnect Board
Card Drawer to Chassis Connector
Internal DB37 connects
to DBK cards. (1 of 3)
Standoff
(2 per card)
Card Drawer to
DBK Card to
Chassis Screw
Card Drawer Screws
(1 of 2)
Steps 7B and 10B
Steps 3A and 13D
JP1 Jumper
Step 6B
JP2 Jumper
Step 6A
Thumbscrew
(1 of 3)
Steps 3B and 13C
Termination Panel
(1 of 3)
Termination Panel to
Card Drawer Screws
Steps 4 and 12
Card Drawer to
Chassis Screw
(1 of 2)
Steps 3A and 13D
OMB-DaqBook User's Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Omb-daqbook 100 seriesOmb-daqbook 200 series

Table of Contents