Installation
1. Unpack the computer.
2. Using the information in the "Line Voltage and Fusing" subsection of the Installation and
Configuration manual, ensure the line voltage, and ground, are correct and within tolerance.
3. Ensure the line voltage switch is set correctly: up for 110 Vac; down for 220 Vac.
4. Ensure the fuse is correct for the voltage being applied to the system you are installing.
5. Remove the shipping spacers in the
110 card cage.
6. Refer to the "Switch Settings" and "Interconnections" sections in the Installation and Con-
figuration manual, then set the switches and install each of the interface driver cards.
7. Install the peripherals. Refer to the installation instructions that are shipped with the peripher-
als for installation information.
8. Using the information in the self-test subsection of the Installation and Configuration manual,
apply power to the computer and ensure that it passes all the self tests.
9. Load the HP-UX Operating System. Refer to the "System Administrator Manual" to load
and run the system operating software. Ensure all self-tests are successfully passed.
10. Verify correct system operation by using the System Functional Test in the HP-UX Operating
System and ensure that the computer is operating correctly with the systems peripherals.
Preventive Maintenance
There is no regularly scheduled preventive maintenance. Clean the filter screen when required for