Re-Installation While The Outdoor Unit Need To Be Repaired - Pioneer WYB-GMFI SERIES Service Manual

16 and 19 seer versions dc inverter split wall-mounted ductless heat pumps
Table of Contents

Advertisement

6.7 Re-installation while the outdoor unit need to be repaired

1. Evacuation for the whole system
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve's service port.
3). Evacuation for approximately one hour. Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
26

Advertisement

Table of Contents
loading

Table of Contents