Download  Print this page

Advertisement

GENERAL
INFORMATION 1-35
Cable, Wire, and Hose
Routing
1. Upper Side
2. Clamp
3. Starter Cable
4. Alternator Lead
5. Clamp
6. To Sidestand Switch
7. Sidestand Switch Lead
8. Neutral Switch Lead
9. Neutral Switch
10. Run the engine ground lead between this bolt and engine mount.
11. Drain Tank
12. Install the clamp as figure.
13. Hold the lead with clamp.
14. Clamp
15. Crankshaft Sensor & Oil Pressure Switch Lead
16. Run the drain hose under the engine ground lead and between the clamp and crankshaft sensor
& oil pressure switch lead.
17. ZR750-H3 - H5 Model

Advertisement

Table of Contents

   Also See for Kawasaki ZR-7S

Comments to this Manuals

Symbols: 0
Latest comments: