Download  Print this page

Meters, Gauges; Meter Unit Removal; Meter Unit Disassembly - Kawasaki ZR-7S Service Manual

Hide thumbs

Advertisement

14-56 ELECTRICAL SYSTEM
Meters, Gauges
Meter Unit Removal
eRemove:
Wind Shield (see Frame chapter)
Upper Inner Cover (see Frame chapter)
• Disconnect the upper end (A] of the speedometer cable.
• Disconnect the meter unit wire connectors [A].
• Remove the mounting nut [8], and take out the meter unit
[C].
CAUTION
Place the meter or gauge so that the face is up. If a
meter or gauge is left upside down or sideways for
any length of time,
it will
malfunction.
Meter Unit Disassembly
eRemove:
Meter Unit (see Meter Unit Removal)
Nuts [A]
Bracket IB)
• Unscrew the screw and remove the trip meter knob [A].
• Unscrew the screws [A] and separate the meter assembly
[8] and upper meter cover [C].

Advertisement

Table of Contents

   Also See for Kawasaki ZR-7S

Comments to this Manuals

Symbols: 0
Latest comments: