Step-By-Step Installation; Select A Site - Samsung RF28K9380SR/ User Manual

Hide thumbs Also See for RF28K9380SR/:
Table of Contents

Advertisement

Available languages

Available languages

Installation

Step-by-step installation

STEP 1 Select a site
The site must:
• Have a solid level surface without carpeting or flooring that may obstruct ventilation
• Be out of direct sunlight
• Have adequate room for opening and closing the door
• Be away from any heat source
• Provide room for maintenance and servicing
• Have a temperature range between 50 °F (10 °C) and 110 °F (43 °C)
Clearance
See the pictures and table below and on the next page for installation space requirements.
A
C
26
English
Untitled-2 26
B
D
Depth "A"
34
Width "B"
35
Height "C"
70
Overall Height "D"
71
/
" (871 mm)
1
4
/
" (908 mm)
3
4
/
" (1797 mm)
3
4
/
" (1825 mm)
7
8
2016-02-15
7:35:34

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rf28k9380sg/aa

Table of Contents