Page 3
This chapter contains information to help you solve the issues. Appendix A: Specifications This appendix provides the Switch’s technical specifications. 2. Conventions The Switch or TL-SL5428E mentioned in this Quick Installation Guide stands for TL-SL5428E 24-Port 10/100Mbps + 4-Port Gigabit JetStream L2 Managed Switch without any explanation. Symbol Description Remind to take note.
Chapter 1 Product Introduction 1.1 Product Overview TP-LINK JetStream L2 Managed Switch provides both Web and Command Line management interface. The Embedded Web Interface supports remote configuration, monitoring troubleshooting. EIA-standardized framework together with smart configuration capacity can provide flexible solutions for different scale of networks.
The linked device is running at 1000Mbps. Yellow The linked device is running at 10/100Mbps. 1.3 Rear Panel The rear panel of TL-SL5428E features a power socket and a Grounding Terminal (marked with Figure 1-2 Rear Panel Grounding Terminal: TL-SL5428E already comes with Lightning Protection Mechanism.
Chapter 2 Installation 2.1 Precautions To ensure a long-term and stable performance of the Switch, please pay attention to the following before the installation. 1) Safety Requirements • Before cleaning the Switch, cut off the power supply. Do not clean it by the waterish cloth, and never use any other liquid cleaning method.
2.2.1 Desktop Installation To install the Switch on the desktop, please follow the steps: 1) Set the Switch on a flat surface strong enough to support the entire weight of the Switch with all fittings. 2) Remove the adhesive backing papers from the rubber feet. 3) Turnover the Switch and attach the supplied rubber feet to the recessed areas on the bottom at each corner of the Switch.
Page 9
L5 42 8E Figure 2-2 Attaching Brackets 2) After the brackets are attached to the Switch, use suitable screws (not provided) to secure the brackets to the rack, as illustrated in the following figure. L5 42 8E Figure 2-3 Mounting Switch 3) Connect the Switch to network devices.
2.3 Connect to Ground Connecting the Switch to ground is to quickly release the lightning over-voltage and over-current of the Switch, which is also a necessary measure to protect the body from electric shock. In different environments, the Switch may be grounded differently. The following will instruct you to connect the Switch to the ground in two ways, connecting to the Grounding Bar or connecting to the Ground via the power cord.
Page 11
• Connecting to the Ground via the power supply If the Switch is installed in the normal environment, the Switch can be grounded via the PE(Protecting Earth)cable of the AC power supply as shown in the following figure. Figure 2-5 The figure is to illustrate the application and principle.
(purchased separately) is installed in a slot and has a valid link on the port, the associated RJ45 port will be disabled and cannot be used. Note: TL-SL5428E supports 100/1000Base-FX SFP module at full-duplex mode. L5 42 8E Figure 3-2 Inserting SFP Module...
3.3 Console Port The Switch features a console interface for configuring the Switch using CLI (Command Line Interface). Caution: The serial port of the computer doesn’t support plug-and-play feature, please make sure the Switch is powered off before connecting the console cable to the computer.
Page 14
Figure 3-4 Connecting to Power Supply The figure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above. Powering on the Switch, it will automatically initialize and its LED indicators will respond as follows: 1) All of the 10/100Mbps and 1000Mbps LED indicators will flash momentarily...
Chapter 4 Login to the Switch 4.1 Login 1) To access the configuration utility, open a web-browser and type in the default address http://192.168.0.1 in the address field of the browser, then press the Enter key. Figure 4-1 Web-browser Note: To log in to the Switch, the IP address of your PC should be set in the same subnet addresses of the Switch.
How to restore the Switch to its factory default settings? Please access the Web-based configuration page: choose menu System System Tools System Reset , click the Reset button on the corresponding page. What can I do if I could not access the web-based configuration page? It is recommended that you should check the following items: 1) Check per port LED on the Switch and make sure the cable is installed...
For all other technical support, please contact us by using the following details: Global Australia & New Zealand Tel: +86 755 26504400 Tel: AU 1300 87 5465 E-mail: support@tp-link.com NZ 0800 87 5465 Service time: 24hrs, 7days a week E-mail: support@tp-link.com.au Service time: 24hrs, 7days a week Singapore...