Precautions In Disassembly And Reassembly; Disassembly; Reassembly; Confirmation After Reassembly - Hitachi uc 24yfb Technical Data And Service Manual

Table of Contents

Advertisement

9. PRECAUTIONS IN DISASSEMBLY AND REASSEMBLY

The [Bold] numbers in the descriptions below correspond to the item numbers in the Parts List and exploded
assembly diagram for UC 24YFB.

9-1. Disassembly

(1) Remove the four Tapping Screws (W/Flange) D3 x 20 [6] and take off Case (A) [2].
The Printed Circuit Board Ass'y [4] and the Cord [9] can then be taken out in an assembled body.
(2) To separate the Printed Circuit Board Ass'y [4] and the Cord [9], melt the soldered portions with a soldering iron.
(NOTE) Ideally, the soldered portions should be free with a solder absorber. If a soldering iron must be used,
use one with a rated power of 35 W.

9-2. Reassembly

Reassembly can be accomplished by following the disassembly procedures in reverse; however, special attention
should be given to ensure that lamps, cord armor and charging terminals are properly installed in their prescribed
grooves.

9-3. Confirmation after Reassembly

(1) Confirm the following when the battery is fully charged.
• Confirm that the red pilot lamp on the charger lights up.
• When charging an EB 2430H battery, confirm that the red pilot lamp flashes at 1 second intervals approx. 60
minutes from commencing charging.
(2) Measure the insulation resistance and conduct a dielectric strength test.
• Insulation resistance: 10 MΩ or more between the plug blade of cord and the Name Plate or case fastening
• Dielectric strength test:
(a) Between the plug blade of cord and the charging terminal blade.
(b) Between the plug blade of cord and the Name Plate or fastening screws on the case.
Based on the voltage listed on the Name Plate, dielectric strength test should be conducted.
Voltage on the name plate
CAUTION: Without fail, insulation resistance must be measured between the plug blade of cord and the
Name Plate or fastening screws, and dielectric strength test must be conducted between the
plug blade of cord and the charging terminal blade or between the plug blade of cord and the
Name Plate or fastening screws on the case. Under no circumstances should testing be
conducted between both blades of the plug, or both blades of the charging terminal, which
may cause burn-out of the charger.
screws, with DC 500 V Megohm Tester.
120 V
230 V, 240 V
Test voltage
AC 1,240 V (1 minute)
AC 3,750 V (1 minute)
14

Advertisement

Table of Contents
loading

Table of Contents