Du/dt fillter plus voltage peak limiter
Hide thumbs Also See for SINAMICS G120P:

Advertisement

Connection
When connecting the du/dt reactor and Voltage Peak Limiter, you must take into account the
following conditions to ensure that it functions correctly:
● Control cables must be routed separately from power cables. Power cables are the motor
● It is recommended to use shielded motor cables. If a shielded motor cable is used, its
● The ground wire for the motor must be fed directly back to the Power Module.
Connection overview
Figure 4-3
Cable cross-sections
Table 4- 1
Cable cross-sections for connections between the du/dt filter plus Voltage Peak Limiter and Power Module
du/dt filter plus Voltage Peak
Limiter
6SL3000-2DE35-0AA0
6SL3000-2DE38-4AA0
dV/dt filter plus Voltage Peak Limiter
Operating Instructions, 04/2014, A5E32847105B AB
cable or the connecting cables from the DC link of the Power Module (terminals
DCP/DCN) to the Voltage Peak Limiter. In particular, you must ensure that control cables
and power cables are not routed in parallel in a joint cable raceway, even if all the cables
are shielded.
shield should be connected through a large surface area with the shield connection plate
in the cabinet and at the motor housing.
Connecting a du/dt filter plus Voltage Peak Limiter
Connection to the DC link
(DCPS/DCNS)
Line voltage 380 V – 480 V 3 AC
[mm²]
70
2 x 50
Electrical installation
Connection between du/dt reactor and
voltage peak limiter
(1U2, 1V2, 1W2) [mm²]
16
50
21