Omron CQM1H series Operation Manual page 34

Hide thumbs Also See for CQM1H series:
Table of Contents

Advertisement

Nomenclature
CQM1-B7A02
Front View
Left-side View
14
Terminal screws: M3
(Optimum tightening torque: 0.5 N S m)
Name
RDY
Unit ready
19ms/3ms
Transmission
delay time
Common to all models.
Indicators (see following table)
B7A Link Terminal connection terminals 1
For connection of a 16-point output B7A Link Terminal.
External power terminals
Required for transmission with the B7A Link Terminal. Con-
nect a 12- to 24-VDC power supply.
Color
Green
Lit while the CQM1H/CQM1 is supplied
with power.
Orange
Lit while transmission delay time is set
to RAPID (3 ms). Not lit when set to
STANDARD (19.2 ms).
Operation setting DIP Switch
Sets to the operation of the
B7A Interface Unit (see page
15). Set the switches before
mounting the B7A Interface
Unit in CQM1H/CQM1. To set
after mounting, remove the ter-
minal block and make the set-
ting from the front face.
Section 2-1
Function

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cqm1 series

Table of Contents