Download Print this page

Relocation And Maintenance - Mitsubishi Electric MSZ-EF22VE Installation Manual

Advertisement

4. PURGING PROCEDURES, LEAK TEST, AND TEST RUN
4-1. PURGING PROCEDURES AND LEAK TEST
1) Remove service port cap of stop valve on the side of the outdoor unit gas pipe. (The
stop valves are fully closed and covered in caps in initial state.)
2) Connect gauge manifold valve and vacuum pump to service port of stop valve on the
gas pipe side of the outdoor unit.
*4 to 5 turns
Stop valve cap
(Torque 19.6 to
*Close
29.4 N•m, 200
*Open
to 300 kgf•cm)
Hexagonal wrench
Service port cap
(Torque 13.7 to
17.7 N•m, 140 to
180 kgf•cm)
Precautions when using the control valve When attaching the control valve to
Service port
A
Control valve
Open
Close
Charge hose
Body
3) Run the vacuum pump. (Vacuumize for more than 15 minutes.)
4) Check the vacuum with gauge manifold valve, then close gauge manifold valve, and
stop the vacuum pump.
5) Leave as it is for one or two minutes. Make sure pointer gauge manifold valve remains
in the same position. Confirm that pressure gauge shows –0.101 MPa [Gauge] (–760
mmHg).
6) Remove gauge manifold valve quickly from service port of stop valve.
7) After refrigerant pipes are connected and evacuated, fully open all stop valves on both
sides of gas pipe and liquid pipe. Operating without fully opening lowers the perform-
ance and this causes trouble.
8) Refer to 1-3., and charge the prescribed amount of refrigerant if needed. Be sure to
charge slowly with liquid refrigerant. Otherwise, composition of the refrigerant in the
system may be changed and affect performance of the air conditioner.
9) Tighten cap of service port to obtain the initial status.
10) Leak test

5. RELOCATION AND MAINTENANCE

5-1. REMOVING AND INSTALLING THE PANEL ASSEMBLY
Removal procedure
1) Unlock the upper and lower vanes as
shown in
and
using a thin instrument.
Then, remove the horizontal vanes.
2) Remove the 2 screws which fix the panel
assembly.
3) Remove the panel assembly. Be sure to
remove its bottom right end first.
3
3
3
Installation procedure
1) Install the panel assembly following the removal
procedure in reverse.
2) Be sure to press the positions as indicated by the
arrows in order to attach the assembly completely to
the unit.
3) Install the horizontal vanes.
5-2. REMOVING THE INDOOR UNIT
Remove the bottom of the indoor unit from the installation
plate.
When releasing the corner part, release both left and right
bottom corner part of indoor unit and pull it downward and
forward as shown in the figure on the right.
Compound pressure gauge
0.101 MPa
(for R410A)
(
760 mmHg)
Pressure gauge
(for R410A)
Stop valve
for LIQUID
Gauge manifold valve
(for R410A)
Handle
Low
Handle High
Charge hose
Stop valve for
(for R410A)
GAS
Adapter for pre-
venting the back
Vacuum pump (or the vacuum
flow
pump with the function to
prevent the back flow)
the service port, valve core may de-
form or loosen if excess pressure is
applied. This may cause gas leak.
When attaching the control valve to
the service port, make sure that the
valve core is in closed position, and
then tighten part A. Do not tighten
part A or turn the body when valve
core is in open position.
Unlock
Upper and
lower vanes
3
4-2. TEST RUN
1) Insert power supply plug into the power outlet and/or turn on
the breaker.
2) Press the E.O. SW once for COOL, and twice for HEAT
operation. Test run will be performed for 30 minutes. If the
left lamp of the operation indicator blinks every 0.5 seconds,
inspect the indoor/outdoor unit connecting wire (A) for mis-
wiring. After the test run, emergency mode (set temperature
24°C) will start.
3) To stop operation, press the E.O. SW several times until all
LED lamps turn off. Refer to operating instructions for details.
Checking the remote (infrared) signal reception
Press the ON/OFF button on the remote controller (6) and check that an electronic sound
is heard from the indoor unit. Press the ON/OFF button again to turn the air conditioner off.
• Once the compressor stops, the restart preventive device operates so the compressor
will not operate for 3 minutes to protect the air conditioner.
4-3. AUTO RESTART FUNCTION
This product is equipped with an auto restart function. When the power supply is stopped
during operation, such as during blackouts, the function automatically starts operation in
the previous setting once the power supply is resumed. (Refer to the operating instruc-
tions for details.)
Caution:
• After test run or remote signal reception check, turn off the unit with the E.O. SW or
the remote controller before turning off the power supply. Not doing so will cause the
unit to start operation automatically when power supply is resumed.
To the user
• After installing the unit, make sure to explain the user about auto restart function.
• If auto restart function is unnecessary, it can be deactivated. Consult the service
representative to deactivate the function. Refer to the service manual for details.
4-4. EXPLANATION TO THE USER
• Using the OPERATING INSTRUCTIONS, explain to the user how to use the air condi-
tioner (how to use the remote controller, how to remove the air filters, how to remove
or put the remote controller in the remote controller holder, how to clean, precautions
for operation, etc.).
• Recommend the user to read the OPERATING INSTRUCTIONS carefully.
5-3. PUMPING DOWN
When relocating or disposing of the air conditioner, pump down the system following the
procedure below so that no refrigerant is released into the atmosphere.
1) Connect the gauge manifold valve to the service port of the stop valve on the gas pipe
side of the outdoor unit.
2) Fully close the stop valve on the liquid pipe side of the outdoor unit.
3) Close the stop valve on the gas pipe side of the outdoor unit almost completely so that
it can be easily closed fully when the pressure gauge shows 0 MPa [Gauge] (0 kgf/
2
cm
).
4) Start the emergency COOL operation.
To start the emergency operation in COOL mode, disconnect the power supply plug
and/or turn off the breaker. After 15 seconds, connect the power supply plug and/or
turn on the breaker, and then press the E.O. SW once. (The emergency COOL
operation can be performed continuously for up to 30 minutes.)
5) Fully close the stop valve on the gas pipe side of the outdoor unit when the pressure
gauge shows 0.05 to 0 MPa [Gauge] (approx. 0.5 to 0 kgf/cm
6) Stop the emergency COOL operation.
Press the E.O. SW several times until all LED lamps turn off. Refer to operating in-
structions for details.
When pumping down the refrigerant, stop the compressor before disconnecting
the refrigerant pipes. The compressor may burst if air etc. get into it.
HEAD OFFICE: TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO
100-8310, JAPAN
Emergency
operation switch
(E.O. SW)
2
).
WARNING

Advertisement

loading