Miele H6160B Operating And Installation Instructions page 101

Table of Contents

Advertisement

At the end of the activation phase the
steam injection system will need to be
cleaned to remove all traces of
descaling solution.
Cleaning is carried out by flushing
approx. 1 litre of fresh tap water
through the system. The water is
collected in the universal tray. This
process is repeated three times.
M Take the universal tray out of the
oven and empty it. Place the tray
back in the oven again on the top
shelf level.
N Remove the plastic tube from the
container.
O Rinse the container and fill with
approx. 1 litre of fresh tap water.
P Place the container back in the oven,
insert the plastic tube, secure it to
the container and close the door.
Q Touch the OK sensor.
Cleaning and care
The intake process for the first rinse (E
2) will begin.
Water will be flushed through the steam
injection system and will then collect in
the universal tray.
R Take the universal tray out of the
oven and empty it. Place the tray
back in the oven again on the top
shelf level.
S Remove the plastic tube from the
container. Fill it with approx. 1 litre of
fresh tap water.
T Place the container back in the oven,
insert the plastic tube, secure it to
the container and close the door.
U Touch the OK sensor.
The intake process for the second
rinse (E 3) will begin.
V Repeat the last four steps.
The intake process for the third rinse
(E 4) will begin.
Leave the universal tray (with the
water which has collected in it) on the
top oven shelf whilst the evaporation
process takes place.
W Remove the container and tube from
the oven.
101

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H6260b

Table of Contents