Outdoor Unit Installation Drawings; Precautions On Installation - Daikin RXS71FAV1B8 Installation Manual

Hide thumbs Also See for RXS71FAV1B8:
Table of Contents

Advertisement

Outdoor Unit Installation Drawings

Max. allowable length
Min. allowable length
**
Max. allowable height
Additional refrigerant
*
required for refrigerant
pipe exceeding 10m
in length.
Gas pipe
O.D. 15.9mm
Liquid pipe
O.D. 6.4mm
Be sure to add the proper amount of additional refrigerant.
*
Failure to do so may result in reduced performance.
The suggested shortest pipe length is 1.5 m, in order to avoid
**
noise from the outdoor unit and vibration.
(Mechanical noise and vibration may occur depending on how
the unit is installed and the environment in which it is used.)
If there is the danger of the unit falling
or overturning, fix the unit with
foundation bolts, or with wire or other
means.
If the location does not have good
drainage, place the unit on a level
mounting base (or a plastic pedestal).
Install the outdoor unit in a level
position. Failure to do so may result in
water leakage or accumulation.

Precautions on Installation

• Check the strength and level of the installation ground so that the unit will not cause any operating vibration or noise after installed.
• In accordance with the foundation drawing, fix the unit securely by means of the foundation bolts. (Prepare four sets of M8 or M10
foundation bolts, nuts and washers each which are available on the market.)
• It is best to screw in the foundation bolts until their length are 20mm from the foundation surface.
3
30m
1.5m
20m
20g/m
Allow 30cm of work
space below the
ceiling surface.
Level mounting base
(available separately)
Also insulate the connection on the outdoor unit.
Clamping material
Tape
Use tape or insulating material on all connections
to prevent air from getting in between the copper
piping and the insulation tube.
Be sure to do this if the outdoor unit is installed
above.
Wrap the insulation
pipe with the finishing
tape from bottom to top.
CAUTION
** Set the piping length
from 1.5m to 30m.
Allow space for piping
and electrical servicing.
Right side plate
Insulation tube
Service lid
■English

Advertisement

Table of Contents
loading

Table of Contents