Removing The Vertical Vane Motor Unit - Mitsubishi Electric MSZ-GE09NA Service Manual

Split-type air conditioners
Hide thumbs Also See for MSZ-GE09NA:
Table of Contents

Advertisement

OPERATING PROCEDURE
4. Removing the nozzle assembly
(1) Remove the panel (Refer to 1.) and the corner box.
(2) Remove the V.A. clamp, and then the indoor/outdoor
connecting wire. (Refer to 2 (2)-(4).)
(3) Remove the electrical cover. (Photo 2)
(4) Disconnect the following connectors on the electronic
control P.C. board:
CN151 (Horizontal vane motor)
CN152 (Vertical vane motor)
(5) Remove the power monitor receiver holder. (Photo 2)
(6) Pull out the drain hose from the nozzle assembly and
remove the nozzle assembly.
(7) Remove the vane motors. (Refer to 5 and 6.)

5. Removing the vertical vane motor unit

(1) Remove the nozzle assembly. (Refer to 4.)
(2) Remove the crank of the vertical vane motor unit from
the arm of the vertical vane.
(3) Remove the screw of the vertical vane motor unit, and
pull the vertical vane motor unit.
(4) Remove the screws of the vertical vane motor unit
cover.
(5) Remove the crank of the vertical vane motor unit from
the shaft of the vane motor.
(6) Remove the vertical vane motor from the vertical vane
motor unit.
(7) Disconnect the connector of vertical vane motor from
the vertical vane motor.
6. Removing the horizontal vane motor
(1) Remove the nozzle assembly. (Refer to 4.)
(2) Remove the screws of the horizontal vane motor unit,
and pull out the horizontal vane motor unit.
(3) Disconnect the connector from the horizontal vane
motor.
(4) Remove the screws of the horizontal vane motor unit
cover.
(5) Remove the horizontal vane motor from the horizontal
vane motor unit.
OBH548D
Photo 4
Screw of the vertical
vane motor unit
Photo 5
Photo 6
Screws of the
horizontal vane
motor unit
45
PHOTOS
Screws of
the vertical
vane motor
unit cover
Screws of the
horizontal vane
motor unit cover

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents