Brother PR600II Service Manual page 106

Hide thumbs Also See for PR600II:
Table of Contents

Advertisement

Main unit
12
Operation panel lever assembly (Step 1)
1. Align operation panel lever B 2 with operation panel lever C 1, thread
the operation panel level shaft 3 through them, and then attach the
retaining ring E6.
2. Align operation panel lever B 2 with operation panel lever A 4, thread
the operation panel level shaft 3 through them, and then attach the
retaining ring E6.
3. Tighten the thumb bolt (M4 L) 5, spring washer (2-4) 6, and plain
washer (M4) 7. (3 locations)
13
Operation panel lever assembly (Step 2)
1. Attach the retaining ring E6 to the operation panel holder shaft.
2. Align the operation panel holder 2 with operation panel lever A 1, thread
the operation panel holder shaft 3 through them, and then attach the
retaining ring E6 from the inside of operation panel lever A.
3. Tighten the thumb bolt (M4 L) 4, spring washer (2-4) 5, and plain
washer (M4) 6. (2 locations)
3 - 8
Operation panel
3
5
6
7
1
7
6
5
2
4
Retaining ring E6
Retaining ring E6
Retaining ring E6
1
3
4
5
6
3
5
6
7
2
6
5
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pr620

Table of Contents