Frame Assembly Up/Down; Belt Loading; Gear Pulley; Gear Loading - LG V9120W Service Manual

Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY

GEAR PULLEY

SCREW INSERTION
TORGUE CONTROL
(800gf DOWN)

GUIDE UP/DOWN

5. Frame Assembly Up/Down (Fig. 5-4)
Note
Put the Base Main face down(Bottom Side)
1) Release the screw(S4)
2) Unlock the Locking Tab(L3) in direction of arrow and
then lift up the Frame Assembly Up/Down to separate
it from the Base Main.
Note
• When reassembling move the Guide Up/Down in direction
of arrow(C) until it is positioned as Fig.(C).
• When reassembling insert (A) portion of the Frame
Assembly Up/Down in the (B) portion of the Guide
Up/Down as Fig.(B)
6. Belt Loading(Fig. 5-4)
Note
Put the Base Main on original position(Top Side)
7. Gear pulley (Fig. 5-4)
1) Unlock the Locking Tab(L4) in direction of arrow(B) and
then separate the Gear Pulley from the Base Main.

GEAR LOADING

(L4)

BELT LOADING

PWB ASSEMBLY LOADING

BASE MAIN

(A)
(B)
(L5)
FIG. (A)
(C)
(B)
GUIDE UP/DOWN
FIG. (C)
GUIDE UP/DOWN
(L6)
(H1)
(C2)
(S5)
(S4)
(A)
UP/DOWN FRAME ASSEMBLY
(A)
(B)
FIG. (B)
GUIDE UP/DOWN
Fig. 5-4
8. Gear Loading (Fig. 5-4)
9. Guide Up/Down (Fig. 5-4)
1) Move the Guide Up/Down in direction of arrow(A) as
Fig.(A)
2) Push the Locking Tab(L5) down and then lift up the
Guide Up/Down to separate it from the Base Main.
Note
When reassembling place the Guide Up/Down as Fig.(C)
and move it in direction arrow(B) until it is locked by the
Locking Tab(L5). And confirm the Guide Up/Down as Fig.(A)
10. PWB Assembly Loading (Fig. 5-4)
Note
Put the Base Main face down(Bottom Side)
1) Release 1 Screws(S5)
2) Unlock the Loading Motor (C2) from the Hook (H1) on
the Base Main.
3) Unlock 2 Locking Tabs(L6) and separate the PWB
Assembly Loading from the Base Main.
11. Base Main(Fig. 5-4)
5-4
(L3)
(L6)
BASE MAIN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V9120qw1m

Table of Contents